The coarse soil on the excavated ground is stripped and leveled with gravel. Special drainage pipes are laid for drainage in the gravel. Attention is paid to the slopes of the drainage pipes so that they can discharge the groundwater. In order to carry out this process properly, the thickness of the stone chips should not be less than 18 cm.